On-Premise Switching Deployment Requirements
Capabilities:
- Fully Redundant
- 20,000 SIP sessions
- 2,000 Calls-Per-Second
- 7,500 media sessions
- 2,500 transcoded sessions
Note: Capabilities are per server pair, with 3 total pairs supported.
Hardware Requirements:
- 2 x Intel E5-2680 V2 Processor (20 cores/40 threads) or larger
- 128GB Ram or larger
- 4 x 500GB SSD RAID10 or larger
- 2 x 1 GB Ethernet Interfaces
- 2 x 10Gb Ethernet Interfaces Recommended
- Rackmount Server
- Redundancy Requirement
- Switching must be deployed in server pairs (2), to maintain high availability. To scale out a single Switching Deployment, 2 additional server pairs may be added to the deployment at a time with the max total of 6 servers.
Related Articles
TS
A TS (Traffic Switch) handles the main logic for switching. LB (Load Balancer) passes traffic to the TS after initial authentication. All signaling is handled by this component.
TM
The TM (Traffic Manager) handles the routing logic for switching. The TS (Traffic Switch) sends the query to TM which sends back the routing choice.
Billing / Invoice Descriptions
Below are detailed descriptions of billing and invoice items. If you require further information please reach out to sales@46labs.com HCVoice HCVoice Service Provider Session Commitment: a.k.a Peeredge CloudSwitch Ports + PECS fees and Charges ...
Latest Push List for PE/ECO
August 2022 Push List: DNC List: The National Do Not Call Registry is a list of phone numbers from consumers who have indicated their preference to limit the telemarketing calls they receive. The DNC list will be loaded into a 46 Labs managed ...
Failover
Failover refers to the process of switching to a redundant or standby computer server, system, hardware component or network upon the failure or abnormal termination of the previously active application, server, system, hardware component or network.